18 July, 2007

Day 12: Electirc and Framing

With the plumbing inspection passed, I moved on to the electric and framing. I'd already started the electric last week, so it really just meant threading all the Romex into the boxes and connecting the switch. We put in a triple switch just to the right-hand side of the door. It controls an overhead light, two side vanity lights, and the exhaust fan.


Here you can see the two boxes for the vanity lights and the framing for the medicine cabinet. I re-used some timbers that I had to remove from another portion (behind the shower) and also from an old playhouse that we just tore down.


Tomorrow: electrical and framing inspection!

0 Comments:

Post a Comment

<< Home